BAYAZITOGLU
Turnkey (İLLER BANKASI)

Wastewater Treatment Plant

Infrastructure Renewal and Wastewater Treatment Plant for Bababeski District

We have successfully completed the project tendered by the İLLER BANK in Babaeski, one of the prominent districts of Kırklareli. The project was carried out with the aim of strengthening the infrastructure of the district and providing environmentally friendly wastewater management.

Project Objectives:

- Improve the quality of life in the district.
- Modernize infrastructure systems.
- Provide sustainable environmental solutions.
- Enhance wastewater management.

Project Scope:

We carried out infrastructure renewal works throughout the entire Babaeski district. Within this scope:

- We expanded and modernized sewer lines.
- Strengthened drinking water networks.
- Improved stormwater drainage systems.
- Constructed an environmentally friendly wastewater treatment plant.

Environmentally Friendly Wastewater Treatment Plant:

Proper disposal of wastewater without harming the environment was of great importance for Babaeski district. Therefore, we built a modern and environmentally friendly wastewater treatment plant. This facility:

- Cleans and recycles wastewater.
- Minimizes negative impacts on the environment.
- Preserves the district's water resources.

Results:

With the completion of our project, the Babaeski district has gained a more modern, environmentally friendly, and sustainable infrastructure. This is an expression of our commitment to providing clean drinking water to the residents of the district while preserving their environment.

YER

2015

LOCATION

Kırklareli, Turkey

CATEGORY

Infrastructure - Wastewater Treatment - Road

AREA

Entire district